PPAP Submission / Report · editor

Step 1 of 3

Design & Setup

Frame the document before you fill it in: the brand it carries and the page it prints on. Everything updates the preview instantly.

TemplateTemplate
BrandBrand kitManage brand kits ↗

This document uses your workspace brand kit for its logo, colors, and fonts. Add more brand kits to switch between them here.

These apply to this document only and start from the brand kit. To change your brand everywhere, edit the brand kit.
LookDesign look
PagePage setup
Margins are the whitespace framing the page. Around 0.5″–1″ is standard for print; go much smaller and part of your document may be cut off when it's printed.
Next: add sections, blocks, and your header and footer.
Live US Letter portrait preview1 page
75%
Document number
—
Revision
A
Effective date
—
Owner
—
Draft
Part Submission Warrant (PSW)
Part name
Part number
Engineering change level / date
Organization / manufacturing site
Customer / part name
Reason for submission
Submission level (1–5)3
Submission results: dimensional / material / performance
PPAP element requirements
ElementStatusReference / evidence
1. Design records[Submitted / Retained / N/A]
2. Engineering change documents[Submitted / Retained / N/A]
3. Customer engineering approval[Submitted / Retained / N/A]
4. Design FMEA (DFMEA)[Submitted / Retained / N/A]
5. Process flow diagram[Submitted / Retained / N/A]
6. Process FMEA (PFMEA)[Submitted / Retained / N/A]
7. Control plan[Submitted / Retained / N/A]
8. Measurement systems analysis (MSA)[Submitted / Retained / N/A]
9. Dimensional results[Submitted / Retained / N/A]
10. Records of material / performance tests[Submitted / Retained / N/A]
11. Initial process studies[Submitted / Retained / N/A]
12. Qualified laboratory documentation[Submitted / Retained / N/A]
13. Appearance approval report (AAR)[Submitted / Retained / N/A]
14. Sample production parts[Submitted / Retained / N/A]
15. Master sample[Submitted / Retained / N/A]
16. Checking aids[Submitted / Retained / N/A]
17. Customer-specific requirements[Submitted / Retained / N/A]
18. Part submission warrant (PSW)[Submitted / Retained / N/A]
Declaration

The organization affirms the samples represented were produced at the production rate/site and meet all customer requirements, and that documented evidence is on file.

Organization authorized signature
Date
Customer approval / disposition
Date
Controlled structureAIAG PPAP 4th edition

Requirements and official formats can change. Before you release this document, you are responsible for verifying its final structure, required sections and fields, content accuracy, applicability, approvals, and that the regulation, standard, customer requirement, or official template you are following is the current version. DataSheets Pro gives you a structured starting point; it does not certify compliance or guarantee that a template is complete, legally sufficient, or current.

Demo preview · sign up to remove the watermark