Skip to main content

Manufacturing & Process template

Control Plan Template: Build & Export Free

Lay out how each characteristic is controlled (specs, methods, sample sizes and reactions), then export a print-ready control plan as a PDF, free to start.

Free to try · No credit card · Exports a clean PDF

Rendered from this template

A live Control Plan rendered from this template, and yours opens the same way, in your brand, and exports to a clean PDF.

Overview

What is a control plan?

A control plan documents the controls used to keep a process and its product in check: for each process step and characteristic, it sets out the specification, how it's measured, how much and how often, and what to do when something goes out of control. It's the document that turns a proven process into a repeatable one.

A good control plan is a table that leaves nothing to chance. Each product or process characteristic is tied to its specification and tolerance, an evaluation or measurement technique, a sample size and frequency, the control method, and a reaction plan for when a result falls outside limits, with clear ownership. It flows directly from the Process FMEA, which identifies what needs controlling.

Control plans are a core APQP tool in automotive and precision manufacturing, and are typically produced for the prototype, pre-launch and production phases. They sit alongside the FMEA and PPAP but do a distinct job: the FMEA finds and ranks the risks, and the control plan defines the ongoing controls that hold them (more below).

The fields

What to include in a control plan

A control plan that actually controls the process is specific and complete. These are the columns reviewers expect, and all of them are in the template.

Field 01

Control plan header

The part, the phase (prototype / pre-launch / production), the team, dates and revision.

Field 02

Process step or operation

The process step or operation each control applies to, in sequence.

Field 03

Characteristic

The product or process characteristic being controlled, and whether it's special or critical.

Field 04

Specification and tolerance

The specification, tolerance or requirement the characteristic must meet.

Field 05

Measurement technique

The evaluation or measurement method and the gauge used to check the characteristic.

Field 06

Sample size and frequency

How many units are checked and how often: the sampling that makes the control meaningful.

Field 07

Control method

How the characteristic is controlled: SPC, check sheet, mistake-proofing or another method.

Field 08

Reaction plan

What to do when a result is out of control (contain, adjust, escalate) so nothing bad ships.

Field 09

Responsibility

Who is responsible for performing the control and the reaction plan.

Field 10

FMEA linkage and approval

The link back to the PFMEA the control addresses, and the plan's approvals.

Step by step

How to make a control plan

Four passes take you from a blank template to a control plan that holds the process.

1

List process steps and characteristics

Lay out the process steps in sequence and the product and process characteristics each one controls, flagging special or critical characteristics.

2

Define specs and measurement

For each characteristic, add the specification and tolerance, and the measurement technique and gauge used to check it.

3

Set sampling and control method

Set the sample size and frequency and the control method (SPC, check sheet, mistake-proofing) that keeps the characteristic in check.

4

Add reaction plans and export

Add the reaction plan and responsibility for each control, link back to the PFMEA, get it approved, and export a print-ready PDF.

Which one

Control plan vs. FMEA

They're companion documents in the same toolkit. One finds and ranks the risks; the other controls them in production.

This template

Control Plan

Documents how each characteristic is controlled in production (spec, measurement, sample size, frequency and reaction plan), the ongoing controls that hold the process.

Use to define the controls that keep the process in check.

The other one

FMEA

Identifies how a product or process can fail, rates the risk and drives actions to reduce it: the analysis that says what needs controlling.

Use to find, rank and act on failure risks first.

See the FMEA template →

Get it right

Common mistakes to avoid

  • Characteristics with no specification or tolerance to control against.
  • No measurement technique or sample plan, so the control isn't meaningful.
  • A missing reaction plan, so no one knows what to do when a result is out of limits.
  • A control plan that isn't linked to the PFMEA that identified the risks.
  • Not updating the plan across the prototype, pre-launch and production phases.
  • Controls listed on paper that aren't actually performed on the floor.

Questions

Frequently asked

What is a control plan?

A control plan documents the controls used to manage a process and its product: for each characteristic, the specification, the measurement method, the sample size and frequency, the control method and a reaction plan. It turns a proven process into a repeatable, controlled one.

What's the difference between a control plan and an FMEA?

An FMEA identifies how a process can fail and ranks the risks; a control plan defines the ongoing controls that keep those risks in check in production. The FMEA is the analysis; the control plan is the control. A Process FMEA feeds directly into the control plan.

What are the three phases of a control plan?

Prototype (controls during initial builds), pre-launch (enhanced controls before full production), and production (the ongoing controls once in full production). The same characteristics are controlled, but the sampling and methods typically tighten in the earlier phases.

What should a control plan include?

A header with the part and phase, the process steps, the characteristics with their specs and tolerances, the measurement techniques, sample sizes and frequencies, control methods, reaction plans, responsibilities, and the link to the PFMEA. This template includes all of them.

How does a control plan link to the PFMEA?

The Process FMEA identifies the high-risk failure modes, their causes and the controls needed. Those become the characteristics the control plan then controls, each with a spec, a measurement method, a sample plan and a reaction plan. The two are meant to be consistent and are usually reviewed together.

Build your Control Plan now

Fill in the fields, apply your brand, and export a clean PDF. Free to start.

Note: This template gives you a structured starting point for a control plan. You remain responsible for the accuracy of the characteristics, specifications, controls and reaction plans, and for meeting your own quality system's and customer's requirements before you release it.