Overview

What is an FMEA?

An FMEA (Failure Mode and Effects Analysis) is a structured method for finding the ways a product or process can fail before it does, identifying each potential failure mode, its effects and causes, and the controls in place, then rating the risk so the team can act on what matters most.

An FMEA is worked as a table. For each function, it lists the potential failure modes and their effects (rated for Severity), the causes (rated for Occurrence) and the current controls (rated for Detection), then prioritizes with a risk figure: the newer AIAG-VDA approach uses Action Priority (AP), the traditional one a Risk Priority Number (RPN). High-risk items get recommended actions, owners and a re-rating once the actions are done.

FMEAs come in two main forms, Design FMEA (DFMEA) for a product design and Process FMEA (PFMEA) for a manufacturing process, and are standard in automotive, aerospace and medical device work. A PFMEA feeds directly into the control plan (more below).

The fields

What to include in an FMEA

An FMEA that actually reduces risk is complete and consistently rated. These are the columns reviewers expect, and all of them are in the template.

Field 01

FMEA header

The item or process, the team, the dates and the revision, so the analysis is identified and controlled.

Field 02

Function or requirement

The function or requirement being analyzed: what the item or process is supposed to do.

Field 03

Potential failure mode

The ways the function could fail to be met: the failure modes to analyze.

Field 04

Effects and severity (S)

The effects of each failure mode and their Severity rating on a consistent scale.

Field 05

Causes and occurrence (O)

The potential causes of each failure mode and their Occurrence rating.

Field 06

Controls and detection (D)

The current prevention and detection controls, and the Detection rating.

Field 07

Risk rating (AP or RPN)

The Action Priority (AIAG-VDA) or Risk Priority Number that ranks where to act first.

Field 08

Recommended actions

The actions to reduce risk on the high-priority items, with owners and target dates.

Field 09

Actions taken and results

What was actually done, and the result: the evidence the risk was addressed.

Field 10

Re-rated risk

The Severity, Occurrence and Detection re-rated after the actions, to confirm the risk came down.

Step by step

How to fill out an FMEA

Four passes take you from a blank worksheet to a prioritized, actioned FMEA.

1

Define the item and function

Add the FMEA header and the function or requirement being analyzed: the design or process step and what it's meant to do.

2

Identify failure modes, effects and causes

For each function, list the potential failure modes, their effects and their causes, and the current prevention and detection controls.

3

Rate and prioritize

Rate Severity, Occurrence and Detection on consistent scales and let the Action Priority (or RPN) show where to act first.

4

Assign actions, re-rate and export

Add recommended actions with owners and dates, record what was done, re-rate the risk, then export a print-ready PDF.

Which one

FMEA vs. control plan

They're companion documents in the same quality toolkit. One finds and ranks the risks; the other controls them in production.

This template

FMEA

Identifies how a product or process can fail, rates the risk (Severity, Occurrence, Detection) and drives actions to reduce it: an analysis and a to-do list.

Use to find, rank and act on failure risks in a design or process.

The other one

Control Plan

Documents how each product and process characteristic is controlled in production: spec, measurement, sample size, frequency and reaction plan.

Use to define the ongoing controls that keep the process in check.

See the Control Plan template →

Get it right

Common mistakes to avoid

  • Listing failure modes without their effects and causes, so nothing can be rated or acted on.
  • Inconsistent Severity, Occurrence and Detection scales across the team.
  • Chasing the RPN number instead of acting on high-severity items and Action Priority.
  • No recommended actions for the high-risk items: analysis with no follow-through.
  • Not re-rating the risk after actions are taken.
  • Treating the FMEA as one-time paperwork instead of a living document updated after changes.

Questions

Frequently asked

What is an FMEA?

An FMEA (Failure Mode and Effects Analysis) is a structured method for identifying how a product or process can fail, the effects and causes of each failure mode, and the controls in place, then rating and prioritizing the risk so the team acts on what matters most.

What's the difference between DFMEA and PFMEA?

A DFMEA (Design FMEA) analyzes how a product's design could fail to meet its requirements. A PFMEA (Process FMEA) analyzes how a manufacturing process could fail to make the product correctly. They use the same method; the difference is whether the subject is the design or the process.

What's the difference between RPN and Action Priority (AP)?

RPN (Risk Priority Number) is Severity × Occurrence × Detection, a single number long used to rank risks. The newer AIAG-VDA approach replaces it with Action Priority (AP: High/Medium/Low), which weights severity more sensibly and points to where action is needed. Many teams now use AP; both aim to prioritize action.

What should an FMEA include?

A header, the function or requirement, potential failure modes, effects and Severity, causes and Occurrence, controls and Detection, a risk rating (AP or RPN), recommended actions with owners, actions taken, and re-rated risk. This template includes all of them.

How does an FMEA relate to a control plan?

A Process FMEA feeds the control plan: the causes and controls identified for high-risk failure modes become the characteristics the control plan then controls in production, with a specification, a measurement method, a sample plan and a reaction plan. The FMEA finds the risks; the control plan keeps them in check.

Build your FMEA now

Fill in the fields, apply your brand, and export a clean PDF. Free to start.

Note: This template gives you a structured worksheet for an FMEA. It does not perform the analysis or determine the risk for any specific product or process. You remain responsible for the accuracy of the failure modes, ratings and actions and for meeting your own quality system's and customer's requirements.